Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Jul 10, 2022     Drilling and Priming the left wing ribs - (5.5 hours)       Category: Wings
In this session, I used a new step drill to enlarge the various holes in the left wing ribs. I found writing the desired hole diameters next to their holes on each of the ribs made the step drilling process much quicker, since each rib has different numbers and sizes of holes. After drilling the holes, I deburred them all, then scuffed the surfaces of the ribs, wiped them down with mineral spirits, and sprayed a layer of primer. After both sides had dried for a few minutes, I moved them all inside to finish curing over night.

What's next? I'll need to re-identify which ribs go in which positions, install all of the snap bushings, and start assembling the ribs with clecos.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.